CMZStudio

Structural Calculations & Permit Drawings

Structural calculations show that the proposed framing, foundations, and connections can resist required gravity, wind, and seismic loads. We translate that analysis into coordinated structural permit drawings, sign the documents within our responsibility, and respond to structural plan-check comments.

Before we start calculations, you can check your city's current permit fees and process on GetYourPermit.

Structural drawings and calculation sheets arranged on an engineer's desk
Typical engineering timeline
1–2 weeks
Permit required?
Yes — for the submitted structural work
What you receive
Signed calculations and coordinated drawings
Cost basis
Free review; fixed proposal after scope

Timelines and fee basis are CMZStudio planning estimates based on industry experience. They are not City processing times, official fee schedules, or a project-specific proposal.

Is this your situation?

  • Residential remodels and additions
  • ADUs and new homes
  • Beam, header, deck, and foundation changes
  • Architects who need a structural set coordinated to their plans
Architectural floor plans beside a city plan-check correction letter

What you receive

Every engagement ends in signed documents your contractor can build from and the city can approve.

Structural calculation package beside a coordinated framing plan
  1. 01

    Design criteria and calculations

    We document loads, assumptions, analysis, and member or connection design.

  2. 02

    Coordinated structural drawings

    Plans and details communicate the engineered system to plan check and the builder.

  3. 03

    Plan-check support

    We answer structural comments and revise our documents when the approved scope changes.

How the engineering is done

  1. 1

    Scope

    Confirm the project, jurisdiction, architectural set, and structural deliverables.

  2. 2

    Coordinate

    Resolve grids, openings, elevations, materials, and conflicts before analysis.

  3. 3

    Design

    Complete calculations and develop the structural plans and details.

  4. 4

    Submit

    Provide signed documents and structural responses during permit review.

Exploded technical cutaway of roof, floor, wall, and foundation structural layersEngineer workstation displaying a framing plan and structural calculations
Lei Zheng, California-licensed Civil Engineer and Principal Engineer at CMZStudio

Lei Zheng

Founder & Principal Engineer, CMZStudio

California Professional Engineer

California-licensed engineering

Licensed engineering from first calculation through plan check.

Lei Zheng has held a California Civil Engineer license since 2006. At CMZStudio, he reviews structural decisions, prepares and stamps engineering documents, and supports responses through city plan check.

Official California DCA record

C-69809

CLEAR
License holder
Lei Zheng
License type
Civil Engineer
Issued
March 17, 2006
Verify license

Status verified July 23, 2026

California-licensed
20 years
Official DCA record
C-69809

Direct answers before you call

The permit jurisdiction and site conditions control the final scope. We confirm both during the free initial review.

Request a free structural review

Prefer to talk? +1 510-277-7700 · Mon–Fri · 9:00–18:00

Tell us the address and what you want to change. The engineer replies by phone.

Required fields

CallRequest review