CMZStudio

Structural Engineer for Load-Bearing Wall Removal

Removing a load-bearing wall changes how roof and floor loads reach the foundation. We calculate the replacement beam, posts, connections, and supporting footings, then prepare the structural drawings typically needed for a building permit.

Open great room after a load-bearing wall removal with a concealed beam
Typical engineering timeline
1–2 weeks
Permit required?
Yes — before structural work
What you receive
Beam calculations and permit drawings
Cost basis
Free review; fixed proposal after scope

Timelines and fee basis are CMZStudio planning estimates based on industry experience. They are not City processing times, official fee schedules, or a project-specific proposal.

Is this your situation?

  • Open-concept kitchen and great-room remodels
  • New openings in exterior or interior bearing walls
  • Flush or concealed beam design
  • Projects with new point loads over existing framing or foundations
Partially opened bearing wall with temporary shoring in a California ranch house remodel

What you receive

Every engagement ends in signed documents your contractor can build from and the city can approve.

Structural detail sheet for a flush beam, posts, connections, and footing
  1. 01

    Load-path assessment

    We identify what the wall supports and where the replacement loads must go.

  2. 02

    Beam and post calculations

    We size the beam, posts, connections, and any required footing upgrades.

  3. 03

    Structural permit drawings

    We show the new opening, member sizes, connections, and construction notes clearly.

How the engineering is done

  1. 1

    Share

    Send the address, proposed opening, photos, and architectural drawings if available.

  2. 2

    Confirm

    Verify joist, rafter, and wall directions plus the foundation below.

  3. 3

    Calculate

    Size the replacement system and check every concentrated load.

  4. 4

    Document

    Deliver structural calculations and drawings for permit and construction.

Technical cutaway of a concealed beam carrying loads through posts to new pad footingsFinished open-concept kitchen and living room with a clean ceiling
Lei Zheng, California-licensed Civil Engineer and Principal Engineer at CMZStudio

Lei Zheng

Founder & Principal Engineer, CMZStudio

California Professional Engineer

California-licensed engineering

Licensed engineering from first calculation through plan check.

Lei Zheng has held a California Civil Engineer license since 2006. At CMZStudio, he reviews structural decisions, prepares and stamps engineering documents, and supports responses through city plan check.

Official California DCA record

C-69809

CLEAR
License holder
Lei Zheng
License type
Civil Engineer
Issued
March 17, 2006
Verify license

Status verified July 23, 2026

California-licensed
20 years
Official DCA record
C-69809

Direct answers before you call

The permit jurisdiction and site conditions control the final scope. We confirm both during the free initial review.

Request a free structural review

Prefer to talk? +1 510-277-7700 · Mon–Fri · 9:00–18:00

Tell us the address and what you want to change. The engineer replies by phone.

Required fields

CallRequest review