CMZStudio

SB 721 Balcony Inspection in California

California Health and Safety Code section 17973 requires qualifying exterior elevated elements at buildings with three or more multifamily dwelling units to be inspected on a recurring schedule. CMZStudio provides engineer-led inspections, written condition reports, and structural repair recommendations when needed.

Exterior elevated balcony and walkway structure for an SB 721 inspection
Typical service timeline
1–2 days on site; report within 2 weeks
Permit required?
Compliance report required; repair permit if needed
What you receive
Signed inspection report and next steps
Cost basis
Fixed proposal after element and access review

Timelines and fee basis are CMZStudio planning estimates based on industry experience. They are not City processing times, official fee schedules, or a project-specific proposal.

Is this your situation?

  • Owners and managers of multifamily buildings with three or more units
  • Balconies, decks, porches, stairs, walkways, and entry structures
  • Properties that need a current inspection report or follow-up repair design
  • Owners coordinating compliance records for a sale or management file
Water-stained balcony soffit with a small opening exposing wood joists

What you receive

Every engagement ends in signed documents your contractor can build from and the city can approve.

Balcony inspection report with an element inventory and photo log
  1. 01

    Element inventory and sampling plan

    We identify qualifying exterior elevated element types and plan the required inspection sample.

  2. 02

    Condition inspection and report

    We document accessible load-bearing and waterproofing conditions, photographs, findings, and required next steps.

  3. 03

    Repair engineering

    When deficiencies require structural work, we can prepare repair calculations and details under a separate scope.

How the engineering is done

  1. 1

    Inventory

    Review the property, unit count, prior reports, plans, and exterior elevated elements.

  2. 2

    Inspect

    Examine the selected elements and coordinate additional testing when visual access is insufficient.

  3. 3

    Report

    Provide photographs, condition findings, service-life observations, and recommendations.

  4. 4

    Repair

    Design or verify structural repairs when the report identifies deficient components.

Technical cutaway of cantilevered balcony joists, waterproofing, and an inspection openingInspector examining a balcony soffit with a borescope camera
Lei Zheng, California-licensed Civil Engineer and Principal Engineer at CMZStudio

Lei Zheng

Founder & Principal Engineer, CMZStudio

California Professional Engineer

California-licensed engineering

Licensed engineering from first calculation through plan check.

Lei Zheng has held a California Civil Engineer license since 2006. At CMZStudio, he reviews structural decisions, prepares and stamps engineering documents, and supports responses through city plan check.

Official California DCA record

C-69809

CLEAR
License holder
Lei Zheng
License type
Civil Engineer
Issued
March 17, 2006
Verify license

Status verified July 23, 2026

California-licensed
20 years
Official DCA record
C-69809

Direct answers before you call

The permit jurisdiction and site conditions control the final scope. We confirm both during the free initial review.

Request a free structural review

Prefer to talk? +1 510-277-7700 · Mon–Fri · 9:00–18:00

Tell us the address and what you want to change. The engineer replies by phone.

Required fields

CallRequest review